Work plan for 2017.
25.03.2019
Show all

Work plan 2016

APPROVED

Director of the municipal enterprise Ivano-Frankivsk Regional Council operating assets

Kostyshyn VI.

"___" __________ ___ 20 g.

 

work plan

utility company, Ivano-Frankivsk Regional Council operating assets

on 2016 year

Number s / n The content of the event The estimated cost of

(thousand. UAH. )

Responsibility Term

implementation

1 2 3 4 5
1 In order to meet the regional target program of support of the utility company, Ivano-Frankivsk Regional Council operating assets administrator submit proposals main regional budget on budget allocations for 2016 year According to budget allocations V.Kostishin

V.Pasichnyk

in the administrative building on the street. Hrushevskoho, 21 in Ivano-Frankivsk
2. Estimating the repair of the boiler house roof coating 357,0 th. UAH. A.Kudybin 1-quarter
3 Examination of project documentation for the repair of the boiler house roof coating
4 Ремонт дахового покриття над котельнею (600 м.кв.)
5 Складання кошторису на заміну вікон в коридорах на 4-8 floors, the Department of Health Ivano-Frankovsk, lobby hall on 2 floor

99,50 th. UAH.

N.Korolchuk February
6 Заміна вікон (в коридорах на 4-8 floors, the Department of Health Ivano-Frankovsk, lobby hall on 2 поверсі) 2-quarter
7 Painting walls in the corridors 6,7,8 floors, sanding and varnishing the parquet at elevators 15,0 th. UAH. N.Korolchuk January February
8 Repairs, sanding and varnishing of parquet in boardrooms 15,0 th. UAH. N.Korolchuk 2-quarter
9 Elaborate Scheme CCTV

120,0 th. UAH.

V.Gava

V.Pasichnyk

1-quarter
10 Розробити кошторис на виконання робіт по встановленню відеоспостереження 2-quarter
11 Придбання та встановлення системи відеоспостереження на 1-й пост та поновлення її роботи 3-quarter
12 Забезпечення розхідними матеріалами для належної роботи комп’ютерної техніки 20,0 th. UAH. V.Budzik during the year
1 2 3 4 5
13 Preparation and submission of documents for the manufacture of technical documentation on the installation of fire alarm 150,0 th. UAH. A.Kudybin 4-quarter
14 Installation of fire alarm systems 2, 0 million. UAH A.Kudybin 4-quarter
15 Replacing the carpet in the stairwell 1-8 floors 45,0 th. UAH. S.Gayduk 3-quarter
16 Obtaining permission to use tap "Pioneer" 6,0 th. UAH. A.Kudybin February-March
17 To conclude an agreement with a licensed organization for repair of elevators 50,0 th. UAH. V.Gava 1-quarter
18 To conclude an agreement on the maintenance and calibration of gauges Metrology 20,0 th. UAH. A.Tymchiy August
19 To conclude an agreement on maintenance of the boiler house roof 9,0 th. UAH. A.Kudybin 1-and, 4-quarter
20 To conclude an agreement on the calibration of ground contour elevators

25,0 th. UAH.

V.Gava 2-quarter
21 Ensure calibration contour grounding boiler
22 Provide and carry out calibration and replacement of the new facilities for electricity meters and current transformers 25,0 th. UAH. V.Gava 1-quarter
23 Укласти угоду на проведення експертизи посудин під тиском (дахова котельня, pump receivers) 10,0 th. UAH. A.Tymchiy 1-4-quarter
24 In order to save electricity, to replace fluorescent lamps to LED in the corridors 80,0 th. UAH. V.Gava 2-3-quarter
25 In order to save electricity, to replace incandescent lamps in the hall 500 places on saving 20,0 th. UAH. V.Gava 2-quarter
26 Ensure agreement on the examination of elevators number 7,8, and repair work 25,0 th. UAH. V.Gava 2-3-quarter
27 Carry out repairs and replacement lamps Outdoor lighting administrative building, restoration trident 20,0 th. UAH. V.Gava

N.Korolchuk

2-quarter
28 To conclude an agreement to replace and repair valves Fire system 8,0 th. UAH A.Tymchiy August
29 To replace pumps for water supply for fire systems 70,0 th. UAH A.Kudybin 2-quarter
30 Укласти угоди на проведення навчання на курсах підвищення кваліфікації працівників відповідних робітничих професій (при необхідності) 10,0 th. UAH. A.Tymchiy during the year
31 Провести передоплату за друковану кореспонденцію (на наступний рік)

 

 

 

10,0 th. UAH. V.Pasichnyk December
1 2 3 4 5
in the administrative building on the street. Independence, 46 in Ivano-Frankivsk
32 Виготовлення проектно-кошторисної документації на встановлення модульної котельні (на твердому паливі) 90,0 th. UAH. A.Kudybin 1-quarter
33 Встановлення модульної котельні (на твердому паливі) 1,5 mln. S.Babelskyy

A.Kudybin

2-3-quarter
34 Estimating the manufacture and purchase fencing materials, installing fences

80,0 th. UAH.

I.Lahotskyy May June
35 Production of construction documents and setting fire alarm 100, 0 thousand. A.Kudybin 2-quarter
36 Installation of asphalt-concrete pavement in the parking lot 85,0 thousand. I.Lahotskyy 2-quarter
37 Conclusion of the manufacture and installation of ramps 25,0 thousand. I.Lahotskyy 2-quarter
a house on the street. Січових Стрільців,25 у м.Івано-Франківську
38 Repair of sewer Pidvalna 10,5 thousand A.Kudybin

N.Korolchuk

2-quarter
the houses on the street. Harkusha, 9 in Ivano-Frankivsk

and on the street. A.Krushelnytskoho, 3 the mind. Horodenka

39 Work on strengthening the foundation, asfaltnogo cover adjacent to the foundation of the house

 

20,0 th. UAH. N.Korolchuk

A.Kudybin

3-quarter
a house on the street. Shashkevych, 2 in Ivano-Frankivsk
40 Estimating replacement mains, perform repair of the facade, purchase of materials 10,0 th. UAH. BUT. Kudybin,

V.Gava, N.Korolchuk

 

2-quarter
41 Carrying out partial replacement of the mains 3-quarter
42 To conclude an agreement with the licensed organization for the repair of the facade – stucco restoration estimate A.Kudybin

N.Korolchuk

2-3-quarter
a house on the street. Shashkevych, 6 in Ivano-Frankivsk
43 Preparation of design documentation and replacement of electrical equipment and wiring (if necessary) 30,0 thousand. V.Gava 3-quarter
44 Installation of electric heating system (if necessary) 80,0 thousand. V.Gava, A.Kudybin 4-quarter
a house on the street. Independence, 5 in Ivano-Frankivsk
45 To conclude an agreement with the organization licensed for the manufacture of project documentation for replacement of electrical equipment and wiring 42,0 thousand. V.Gava 1-quarter
46 Examination of project documentation for replacement of electrical equipment and wiring 2-quarter
47 To replace electrical equipment and wiring

 

3-quarter
1 2 3 4 5
48 Carry out a partial repair of the facade 80,0 thousand. N.Korolchuk, A.Kudybin 3-quarter
49 To conclude an agreement to repair exterior balconies estimate A.Kudybin 2-3-quarter
50 Carry out internal repairs staircase and corridors 45,0 thousand. N.Korolchuk 1-2-quarter
a house on the street. Galician, 45 the mind. Ivano-Frankivsk
51 Укласти угоду з ліцензованою організацією на виготовлення проектної документації на проведення ремонту фасаду estimate

A.Kudybin 2-3-quarter
52 To conduct the examination of project documentation for the repair of the facade
53 Ensure repairing exterior balconies estimate A.Kudybin 2-3-quarter
in a building on Market Square, 8 the mind. Ivano-Frankivsk
54 Ensure the repair of the facade 2 story 5,0 th N.Korolchuk 3-quarter
a house on the street. Vasyliianok, 62in m. Ivano-Frankivsk

 

55 Ensure the repair to bathroom 3 floor 5,0 thousand. Ya.Bugayçuk 3-quarter
56 Провести встановлення системи пожежегасіння (включаючи засоби пожежегасіння) 198,0 thousand. Ya.Bugayçuk. A.Tymchiy 2-quarter
57 Run Electrical repair floor, power systems, which are in disrepair 9,0 thousand. V.Gava 3-quarter
58 Perform lifting equipment inspection

 

20,0 th. UAH. Ya.Bugayçuk 1-quarter
To prepare the necessary documents to complete and periodic inspection
59 Perform preventive roof and heating system boiler house. Ensure training system for the heating period 5,0 th. pH.. Ya.Bugayçuk 3-quarter
60 Make an estimate on replacement windows 250,0 th. UAH. Ya.Bugayçuk

A.Kudybin

2-quarter
61 To conduct the examination of project documentation for replacement windows
62 To replace windows
63 Perform maintenance in house, restore the inner face of the walls 18,0 th. UAH. Ya.Bugayçuk

N.Korolchuk

August

on the street. Maksimovic 10 and St.. Maksimovic, 10b

64 Проведення робіт по визначенню об’єму та вартості ремонту дахового покриття ( перекрити 1200 м.кв.) estimate A.Kudybin

Ya.Bugayçuk

June
65 Rebuild fences territory 5,0 th. UAH. Ya.Bugayçuk May
66 Restore complex systems of fire 8,0 th. UAH Ya.Bugayçuk

A.Tymchiy

 

3-quarter
1 2 3 4 5
67 Resume electrical systems and outdoor lighting 10,0 th. UAH. V.Gava

Ya.Bugayçuk

July
68 Production of documentation for permanent use land 100.0 th. UAH. S.Babelskyy 1-4-quarter
69 Укласти угоди та забезпечити придбання:
миючого пилососа 12,0 thousand. S.Gayduk 3-quarter
спецодягу для працівників робітничих професій 10,0 thousand. S.Gayduk

A.Pidhirnyy

2-quarter
– electrical 50,0 th. UAH. V.Gava during the year
– Power 10,0 th. UAH. V.Gava during the year
– aluminum battery and plumbing materials 50,0 th. UAH. A.Kudybin during the year
– building materials 150,0 th. UAH. N.Korolchuk during the year
– household chemicals 60,0 th. UAH. S.Gayduk during the year
– washing machine 10,0 th. UAH. S.Gayduk during the year
– 2 air power 3,5 кВт («12») для залу 7 floor 24,0 th. UAH. V.Gava during the year
– 3 air power 2,5 кВт (9) (для кабінетів обласної ради) 45,0 th. UAH. V.Gava during the year
– fire extinguishers, sleeves, fire barrels, Recharging of extinguishers 198,0 th. UAH.

A.Tymchiy 1-4- quarter
– office supplies 20,0 th. UAH. S.Gayduk during the year
70. Provision of health facilities, owned by the management and the operational manual operating assets A.Pidhirnyy during the year
71. Ensuring celebrations, public meetings I.Lahotskyy during the year
72. Accounting, financial reporting V.Pasichnyk during the year
73. Maintenance personnel and administrative documents N.Romaniv during the year
74. Zaprvadzhennya work site CE operating assets V.Budzik 1-quarter

 

Babelskyy C.

 

A Kudybin. Тимчій А.

 

Гава В. Будзик В.

 

Korolchuk H. In Pasichnyk.

 

Лахоцький І. Гайдук С.

 

Бугайчук Я. Романів Н.