The plan of works of the municipal enterprise of the Ivano-Frankivsk regional council on operation of property on 2018 year

APPROVED

Director of the municipal enterprise

Ivano-Frankivsk Regional Council

Operating assets

Kostyshyn VI.

"___" __________ ___ 20 g.

 

work plan utility company, Ivano-Frankivsk Regional Council operating assets on 2018 year

Number s / n The content of the event The estimated cost of

(thousand. UAH. )

Responsibility Term

implementation

Note (justification of works)
1 2 3 4 5 6
1 Post offers key spending on the regional budget allocations for budget 2018 year According to budget allocations V.Kostishin

V.Pasichnyk

December 2017 In order to meet the regional target program of support of the utility company, Ivano-Frankivsk Regional Council operating assets

in the administrative building on the street. Hrushevskoho, 21 in Ivano-Frankivsk

2. Roof repair:

2.1. roof repair - about 3100 sq.m (covering the membrane of the facade - 2500 sq.m., ½ level on the roof boiler 600 m. and partly over OTB "Galychyna")

1300,0 th. UAH. AV Kudybin.

Tymchiy AM.

June In order to ensure the leakage of rain and melt water (elevator rooms, Studio OTB "Galicia", technical floors, engineering unit, switchboard)

Certificate examination 03.10.2016r.

2.2. Replacement of roofing Corps of Engineers - about 550 m. (Euroruberoid coating):

– cost estimates for work, examination of project documentation for roof repairs;

– repair of the roof of the building and over the engineering building)

250,0 th. UAH.
1 2 3 4 5 6
3. Estimation of replacement of windows for metal-plastic constructions and carrying out their replacement:

3.1. corridors

3.2. Second floor lobby

3.3. 3-and security post

Korolchuk NA. July To ensure heat saving resources and budget
80,0 th. UAH
80,0 th. UAH.
50,0 thousand.
4. Installation of an external video surveillance system:

– development of the scheme of installation of video surveillance system;

– development of estimates for the execution of works;

– acquisition and installation of a video surveillance system and its renewal in operation.

 

138,0 thousand. Ґava VO.

VM Budzyk.

May To control access to office building
5. Installation of fire alarm system:

– installation of a fire alarm system

1000,0 th. UAH.

 

Tymchiy AM.

by August According to the "Rules of fire safety in Ukraine"
6. To replace pumps for water supply for fire systems. 100,0 thousand. Tymchiy AM. by September Replacing old pumps for the operation of the fire water supply system.
7. Run replacement and repair of valves Fire system 15,0 th. UAH. Tymchiy AM. by September
8. Arrange home lighting, corridor to replace fluorescent lamps to LED- lighting 180,0 th. UAH. Ґava VO. to December For energy savings and budget.
9. Replacing the pump wells 50, 0 th. UAH. AV Kudybin. the first quarter Replacing old pumps for water supply.
10. Replacement of pipes for water supply 0 floor (300 m.p.) 300,0 th. UAH. AV Kudybin.

Korolchuk NA.

second quarter Replacing worn, Damaged pipes rust
11. Installation of air conditioners in the session hall on the IV floor:

– conducting technical calculations;

– supply of communications;

– purchase and installation.

300,0 th. UAH. AV Kudybin.

Ґava VO.

third quarter To create a comfortable working environment
12. Production design project for construction and repair hall and floor corridor V according to project estimates Basarab VM. February To streamline and modernize facilities
13. Replacement warning system 50,0 thousand. VM Budzyk.

Tymchiy AM.

by September Installation of warning in case of emergency
1 2 3 4 5 6
14. Testing ground contour elevators 12,0 th. UAH. Ґava VO. June July 1 once a year as required PBEES
15. Testing ground contour House 18,0 th. UAH. Ґava VO. June July 1 every 3 years
16. Purchase of PPE, ZEZ, portable ground 15,0 th. UAH. Tymchiy AM. by August According PBEES, according to safety requirements
17. Enter into agreements with licensed organizations:

17.1. maintenance of elevators

17.2. The metrological calibration of pressure gauges, thermometers, etc..

17.3. for examination of pressure vessels (roof boiler room, pump receivers)

17.4. maintenance of boilers

101,0 th. UAH. Ґava VO. January To keep in good condition technically equipment and machinery
30,0 th. UAH. Tymchiy AM. February
15,0 th. UAH. Tymchiy AM. January
115,0 th. UAH. AV Kudybin. September
18. Buy a form for employees of the Department of 19,5 th. UAH. Podgorny AV. March For performance and operation department
19. The current repair work in areas and corridors 400,0 th. UAH. Korolchuk NA. the need To maintain an office building in good condition
20. Reconstruction hall session hall floor IV, installation of video display equipment Press Center 60,0 th. UAH. Kudibin A.v..

Korolchuk NA.

VM Budzyk.

April For the purposes of media

a house on the street. Vasyliianok, 62in m. Ivano-Frankivsk

21. Restoration of the building fire suppression systems 150,0 thousand. Tymchiy AM. October According to the rules of fire safety
 

22.

Repair of drainage systems and parts of the house facade, parts of a covering (canopy) 50,0 thousand. Ukraine Ya.M. May Protect against water ingress on façade and its destruction
23. Perform maintenance staircase 65,5 thousand. Korolchuk NA. June There was no repair of 1975 p.
 

24.

Replacement power panels and machines 25,0 th. UAH. Ґava VO. April Due to the end of life
25. Replacing incandescent bulbs to LED – lighting 8,0 th. UAH. Ґava VO. March To save electricity
1 2 3 4 5 6
 

26.

Purchase and install voltage stabilizers for boilers (0.5 kW, 2 PCS.) 1,5 th. UAH. Ґava VO. January To prevent damage when electricity jumps
 

27.

Setting the ramp for people with disabilities in accordance with the norms and standards 25,0 th. UAH. Ya.Bugayçuk

N.Korolchuk

April For the needs of people with disabilities
a house on the street. Harkusha, 9 in the city of Ivano-Frankivsk (early XX century)
28. Complete repair of the back of the house

 

150,0 th. UAH. AV Kudybin.

 

January Restoration of the facade architectural monuments

a house on the street. Galician, 45 the mind. Ivano-Frankivsk (early twentieth century)

 

 

 

 

 

 

29 .

Repair roof covering, the repair and reconstruction work balconies and decorative elements of the facade 2800,0 th. UAH. AV Kudybin. May With a view to keeping the architectural monument of local importance in good condition and reconstruction emergency facade.

Report №33 / 16 on the technical inspection of building structures 29.10.15.

in a house on Mickiewicz Square, 4 in Ivano-Frankivsk
30. Repair facilities and on floor

 

200,0 th. UAH. Korolchuk NA.

 

July Not long held Repair

in the administrative building on the street. Independence, 46 in Ivano-Frankivsk

31. Building solid boiler 2550,0 th. UAH. AV Kudybin. till the end of the year In order to save budget, heat resources
32. Replacement of pipes of the heating system in the basement ( 200 m.p.) 200,0 th. UAH. Korolchuk NA. May In order to eliminate breaks in old pipes
1 2 3 4 5 6
33. Enclosures territory, Parking arrangement, installation of paving (purchase of materials, performance of works)

350,0 th. UAH.

Lahotskyy IM. May For oblahodzhennya and landscaping the surrounding areas
34. Installation of fire alarm:

34.1. production of construction documents

34.2. installation of fire alarm in the music school (2-5 floor)

34.3. installation of fire alarm in the hall, foyer

214, 0 thousand.

Tymchiy AM.

 

June

 

According to the "Rules of fire safety in Ukraine"

295,0 thousand.

35. Conducting mass cultural and entertainment events Lahotskyy IM. during the year In order to profit from the rental of premises

a house on the street. Independence, 5 in the city of Ivano-Frankivsk (1870)

 

 

 

36.

Installation of electrical networks on the 2nd and 3rd floors (yard extension) 200,0 thousand. Ґava VO. May Report №33 / 15 on the technical inspection of building structures 28.09.15.
37. Facade repair (partial) 100,0 thousand. Andrew VD. June
38. Repair staircase, Interior corridors and yard extension 2-3 floors

 

271,8 thousand. Andrew VD. July
39. Re-equipment of the attic under the attic (reconstruction):

– production of energy passport;

– making a project, examination;

– obtaining a construction permit (architectural monument)

– construction works (restoration);

– obtaining a certificate of commissioning;

– production of technical passport

AV Kudybin.

Andrew VD.

October For the purpose of rational use of property
5,0 thousand.
55,0 thousand.
7,0 thousand.
 

40.

Manufacturing specifications on electrical facilities of the 2nd and 3rd floors 46,0 thousand. Ґava VO. June To ensure the supply of electricity to the object
41. Replacement power supply building 200,0 thousand. Ґava VO. during the year Located in poor condition
1 2 3 4 5 6
42. Repair of the roof drainage system 20,0 thousand. Andrew VD. August damaged by rust, flows
43. Repair of the 2nd and 3rd floors (courtyard extension) for rent 260,0 thousand. Andrew VD. September Is in disrepair

in a building on Market Square, 8 in the city of Ivano-Frankivsk (1870)

 

44. Partial repair of house facade

 

50,0 th. UAH. Tymchiy AM.

 

June To restore the facade architectural monuments

a house on the street. Sichovykh Striltsiv, 25 in Ivano-Frankivsk (1906)

45. Reconstruction of the sewerage of the basement:

– making a project, concluding an agreement with the contractors;

– examination of project documentation;

– obtaining a construction permit;

– works

– preparation of documentation on the ground

130,0 thousand AV Kudybin. July In the absence of sewerage system in the basement
Babelskyy S.D.
46. Replacing risers inside the house sewage system 80,0 thousand. AV Kudybin.
47. Replacement of GRP (input switchgear) and SHCHO (accounting board) of the building 15,0 thousand. Ґava VO. July In connection with faults
48. Production of construction project of the gas boiler 120,0 thousand. Kudibn AV. December In order to save energy and money budget

a house on the street. Shashkevych, 2 in Ivano-Frankivsk (early twentieth century)

 

49. Partial repair of the facade - Update decorative elements of the building 190,0 th. UAH. Ukraine Ya.M.

 

August Partial repair of the facade of the house - the restoration of decorative elements and partial repair of architectural monuments
 

50.

Repairing the house drainage system, repair roof covering inventory
51. Replacement machines, switches, overhaul of electric power 26,0 thousand. Ґava VO. July For the operation of the building
1 2 3 4 5 6
52. Reconstruction of the heating system According PKD AV Kudybin.
53. Re-equipment of the attic under the attic (reconstruction):

– production of energy passport;

– making a project, examination;

– obtaining a construction permit (architectural monument)

– construction works (restoration);

– obtaining a certificate of commissioning;

– production of technical passport

5,0 thousand. AV Kudybin.

Andrew VD.

October For the purpose of rational use of property
55,0 thousand.
7,0 thousand.

a house on the street. Shashkevych, 6 in Ivano-Frankivsk

54. Preparation of design documentation and replacement of electrical equipment and wiring (if necessary) 30,0 thousand. V.Gava 3-quarter The absence of central or individual heating
55. Installation of electric heating system (if necessary)

 

80,0 thousand. V.Gava, A.Kudybin 4-quarter
a house in the street Sheptytsky, 3 the mind. Ivano-Frankivsk
 

56.

Partial roof covering repair 100,0 thousand. Tymchiy AM. May Eliminate leaking into the room 4th floor
 

57.

Repair of electrical networks, installing electric meter 10,0 thousand. Ґava VO. March Replacing old equipment and repair networks
 

58.

Production estimates for modernization of boiler house roof, installation of additional equipment required 25,0 thousand. Tymchiy AM. April To start the boiler operation and space heating
a house on the street. Yunosti, 3 in Ivano-Frankivsk
59. Repair of power supply 10,0 thousand. Ґava VO. March For illumination area, garages
General works

60. Providing services in health facilities, owned by the utility company, Ivano-Frankivsk Regional Council operating assets and compliance access control

 

Podgorny AV. during the year Fulfillment of the CE operating assets
1 2 3 4 5 6
61. Maintenance of engineering networks (plumbing, electrical equipment, water supply and drainage system) AV Kudybin. during the year
62. Carrying out maintenance of elekronnoho vote "Chamber" Budzik.V.V. during the year Fulfillment of the CE operating assets
63. Maintenance alert system, PBX telephone system Krutsyk LB. during the year
64. Maintaining sanitary condition of rooms and his office Haiduk SS. during the year
65. Cleaning house areas and keeping them in good condition Haiduk SS. during the year
66. Support in meeting rooms during meetings, sessions and other events. Budzik.V.V. during the year
67. Conducting periodic training in the workplace, enterprise software areas kits, personal protective equipment), training laws and regulations, Law of Ukraine "On Labor Protection" Tymchiy AM. during the year To prevent injury and pounding CE operating assets
68. Carrying out maintenance of fire extinguishers and fire water supply, fire protection treatment of wooden structures (roofs, scenes, etc.) Tymchiy AM. under the terms An effective way to ensure adminbudivel fires
69. Control energy costs Ґava VO. during the year To implement measures to save money and resources
70. Accounting, financial reporting Pasichnyk VV. during the year According to current legislation
71. Maintenance personnel and administrative documents Romanov NV. during the year According to current legislation
72. procurement Planning, Approval of the annual procurement plan, preparation of tender documentation, Disclosure of procurement and report on public procurement Jurkiewicz VM. during the year According to current legislation
1 2 3 4 5 6
73. Purchase of car 500,0 thousand. Jurkiewicz VM. June-December For the purposes of CE operating assets

 

Babelskyy C.

 

In Jurkiewicz.

 

In Pasichnyk.

 

A Kudybin.

 

Korolchuk H.

 