Number s / n The content of the event The estimated cost of

(thousand. UAH. )

Responsibility Term

implementation

Note (justification of works)
1 2 3 4 5 6
1 Post offers key spending on the regional budget allocations for budget 2019 year According to budget allocations V.Kostishin

V.Pasichnyk

In order to meet the regional target program of support of the utility company, Ivano-Frankivsk Regional Council operating assets
in the administrative building on the street. Hrushevskoho, 21 in Ivano-Frankivsk
2 Replacement of roofing Corps of Engineers - about 500 m. (PVC membrane coating):

– cost estimates for work, examination of project documentation for roof repairs;

– roof covering repair of buildings and engineering corps

250,0 th. UAH.  

 

AV Kudybin.

 

Dorosh I.R.

June In order to safeguard flowing rain water and tadyh uprymischennya engineering unit, Switchboard.

Certificate examination 03.10.2016r.

3 Estimation of replacement of windows for metal-plastic constructions and carrying out their replacement:

3.1. corridors – 9 PC.

3.2. Second floor lobby -7 pieces (large)

3.3. 1-and security post - 2 PC. (large)

3.4. windows on 6 fl. – 7 PC. (offices № 650-655)

Korolchuk NA. July To ensure heat saving resources and budget
80,0 th. UAH.
80,0 th. UAH.
25 th. UAH.
70,0 th. UAH.
1 2 3 4 5 6
4 Installation of an external video surveillance system:

– development of the scheme of installation of video surveillance system;

– development of estimates for the execution of works;

– acquisition and installation of a video surveillance system and its renewal in operation.

158,0 th. UAH. Ґava VO.

VM Budzyk.

May To control access to the commercial court, entry through the 3rd post, maintenance of a spare entrance from UKB
5 Installation of fire alarm system:

– installation of a fire alarm system

1000,0 th. UAH.

 

Tymchiy AM.

by August According to the "Rules of fire safety in Ukraine"
6 Replacement of pumps for water supply for fire systems. 100,0 th. UAH. Tymchiy AM. by September Replacing old pumps for the operation of the fire water supply system.
7 Substitutions and repair valves Fire system 15,0 th. UAH. Tymchiy AM. by September
8 Manage lighting in a house facade, replacement corridor for LED fluorescent lamps- lighting 180,0 th. UAH. Ґava VO. to December For energy savings and budget.
9 Replacing the pump wells 50, 0 th. UAH. AV Kudybin. the first quarter Replacing old pumps for water supply.
10 Replacement warning system 50,0 thousand. VM Budzyk.

Tymchiy AM.

by September Installation of warning in case of emergency
11 Testing ground contour elevators 12,0 th. UAH. Ґava VO. June July 1 once a year as required PBEES
12 Purchase of PPE, ZEZ, portable ground 15,0 th. UAH. Tymchiy AM. by August According PBEES, according to safety requirements
13 Concluding agreements with licensed organizations:

13.1. maintenance of elevators

13.2. The metrological calibration of pressure gauges, thermometers, etc..

13.3. for examination of pressure vessels (roof boiler room, pump receivers)

13.4. maintenance of boilers

101,0 th. UAH.

 

Ґava VO.

 

January

 

To keep in good condition technically equipment and machinery

30,0 th. UAH. Tymchiy AM. February
15,0 th. UAH. Tymchiy AM. January
115,0 th. UAH. Dorosh IV. January
14 Replacement voice in the courtroom on the fourth floor 180 th. UAH. VM Budzyk. April To streamline and modernize the sound system in the hall
15 15.1.The current repair work on the premises. 400,0 th. UAH. Korolchuk NA. the need To maintain an office building in good condition
15.2.Carrying out routine maintenance in the corridor, hall on 7 floor of OTB "Galychyna" (design project, estimate, tender procedure, carrying out works). 200,0 thousand. Basarab VM.

Ґava VO.

Korolchuk NA.

1-second quarter
16 Reconstruction of the sound system in the hall 500 places on 1 fl. 160,0 th. UAH. VM Budzyk. June To streamline and modernize the sound system in the hall
17 Replacing Trident on the house 65.00 th. UAH. Babelskyy S.D June Production of the new
1 2 3 4 5 6
18 Repair rainwater pipes on the building of the vul.Shpytalnoyi 5 th. UAH. AV Kudybin.

Korolchuk NA.

January February Rozhermetezatsiya drainage system
19 Examination of 3 lifts and Technical Overview 2 lifts 20 th. UAH. Ґava VO. June Maintenance of elevators in working order
20 Replacement of two elevators (№6 and №8) 2mln.200tys.hrn. Ґava VO. 4-quarter Due to the end of life
a house on the street. Vasyliianok, 62in m. Ivano-Frankivsk
21 Restoration of the building fire suppression systems 150,0 th. UAH. Tymchiy AM. October According to the rules of fire safety
22 Repair of drainage systems and parts of the house facade 50,0 th. UAH.  

Ukraine Ya.M.

 

May

Securing water from falling on the facade and its destruction
23 Current repairs of the stairwell and facade of the 1st floor 65,5 th. UAH. Korolchuk NA. June Without repair with 1975 p
 

24

Replacement power panels and machines 25,0 th. UAH. Ґava VO. April Due to the end of life
25 Replacing incandescent bulbs to LED – lighting 8,0 th. UAH. Ґava VO. March To save electricity
26 Setting the ramp for people with disabilities in accordance with the norms and standards 50,0 th. UAH. Ya.Bugayçuk

 

April For the needs of people with disabilities
a house on the street. Harkusha, 9 in the city of Ivano-Frankivsk (early XX century)
27 Completion of repairs back of the house

 

150,0 th. UAH. Dorosh IV.

 

March Restoration of the facade architectural monuments
a house on the street. Galician, 45 the mind. Ivano-Frankivsk (early twentieth century)
 

 

 

 

 

 

28

Repair roof covering, carrying out repair and reconstruction works of balconies and decorative elements of the facade (project, expert report, permission)

– drafting, project examination;

– obtaining a permit;

– conducting a tender procedure for the performance of works;

– the works

2800,0 th. UAH.  

 

 

 

 

 

AV Kudybin.

 

Andrew VD.

 

 

 

 

 

 

May

With a view to keeping the architectural monument of local importance in good condition and reconstruction emergency facade.

Report №33 / 16 on the technical inspection of building structures 29.10.15.

in a house on Mickiewicz Square, 4 in Ivano-Frankivsk

1 2 3 4 5 6
29 Re-heat supply, Heat meter installation 50 th. UAH. Dorosh I.R.

Tymchiy AM.

May For easy and timely access to communications
30 30.1.Reconstruction of the assembly hall:

– drafting,

– examination of the project, obtaining a permit;

– conducting a tender procedure for the performance of works;

– the works

 

30.2.Repair of the rack for security guards in the lobby of the 1st floor

700 th. UAH  

Basarab VM.

Dorosh I.R.

Korolchuk NA.

Andrew VD.

 

 

 

June

 

 

 

 

January

 

 

Not long held Repair

in the administrative building on the street. Independence, 46 in Ivano-Frankivsk
31 Replacement for heating 1 fl. foyer 100 th. UAH Dorosh I.R. until September In order to prevent heat loss of resources
32 Repair (replacement) of pipes, (risers) heating system in the house 250 th. UAH Dorosh I.R. until September
33 Repair of the roof over the music school and sound system 50 th. UAH. Dorosh I.R. May To eliminate leaks
34 34.1.Purchase of a 3-phase generator to connect the boiler room during an emergency power outage

34.2.Acquisition of the cart of hydraulic SVU-C20T 1150 mm for carrying out unloading of pellets

60,0 th. UAH.

7,0 th. UAH.

 

Andrew VD.

February For bezpereboynoy of boiler
35 Construction of a canopy (warehouse) near the boiler room for pellets 50 th. UAH Dorosh I.R.

Lahottskyy IM.

June To save pellets
36 Enclosures territory, Parking arrangement, installation of paving (purchase of materials, performance of works)

350,0 th. UAH.

 

Lahotskyy IM.

May For oblahodzhennya and landscaping the surrounding areas
37 Installation of fire alarm:

37.1. production of construction documents

37.2. installation of fire alarm in the music school (2-5 floor)

37.3. installation of fire alarm in the hall, foyer

214, 0 thousand.

 

Tymchiy AM.

 

 

June

 

 

According to the "Rules of fire safety in Ukraine"

295,0 thousand.

38 Conducting mass cultural and entertainment events Lahotskyy IM. during the year In order to profit from the rental of premises
a house on the street. Independence, 5 in the city of Ivano-Frankivsk (1870)
 

 

 

39

Installation of electrical networks on the 2nd and 3rd floors (yard extension) 200,0 th. UAH.  

 

Ґava VO.

 

 

May

Report №33 / 15 on the technical inspection of building structures 28.09.15.
1 2 3 4 5 6
40 Facade repair (partial) 271,8 th. UAH. Andrew VD. June To maintain an office building in good condition
41 Repair staircase, Interior corridors and yard extension 2-3 floors 100 th. UAH.  

Andrew VD.

 

July

To maintain an office building in good condition
42 Re-equipment of the attic under the attic (reconstruction):

– production of energy passport;

– making a project, examination;

– obtaining a construction permit (architectural monument);

– construction works (restoration);

– obtaining a certificate of commissioning;

– production of technical passport

 

AV Kudybin.

Andrew VD.

 

October

 

For the purpose of rational use of property

5,0 th. UAH.
55,0 th. UAH.
7,0 th. UAH.
 

43

Manufacturing specifications on electrical facilities of the 2nd and 3rd floors 46,0 th. UAH.  

Ґava VO.

 

June

To ensure the supply of electricity to the object
44 Replacement power supply building 200,0 th. UAH. Ґava VO. during the year Located in poor condition
45 Repair of the roof drainage system 40,0 th. UAH. Andrew VD. August damaged by rust, flows
46 Repair of the 2nd and 3rd floors (courtyard extension) for rent 260,0 th. UAH. Andrew VD. September Is in disrepair
47 Replacement of windows and repair of doors (facade 2,3 pov.-16 pc. window, 2pcs of balcony doors) 40,0 th. UAH. Andrew VD. during the year Is in disrepair
in a building on Market Square, 8 in the city of Ivano-Frankivsk (1870)
48 Partial repair of house facade

 

50,0 th. UAH.  

Tymchiy AM.

 

 

June

To restore the facade architectural monuments
a house on the street. Sichovykh Striltsiv, 25 in Ivano-Frankivsk (1906)
49 Preparation of land documentation; Babelskyy S.D 3-neighborhood In the absence of sewerage system in the basement
50 Reconstruction of the internal sewerage of the basement:

– project examination;

– concluding an agreement with the contractors;

– obtaining a construction permit;

– works

 

 

325,0 th. UAH

 

 

 

AV Kudybin.

 

 

 

July

1 2 3 4 5 6
51 Replacing the house risers internal sewage system 50,0 thousand. AV Kudybin. June Is in disrepair
52 Replacement of GRP (input switchgear) and SHCHO (accounting board) of the building 15,0 thousand. Ґava VO. July In connection with faults
53 Production of construction project of the gas boiler 120,0 thousand. Kudibn AV.

Tymchiy AM.

December In order to save energy and money budget

a house on the street. Shashkevych, 2 in Ivano-Frankivsk (early twentieth century)

 
 

54

Partial repair of the facade - Update decorative elements of the building 190,0 th. UAH.  

 

 

Ukraine Ya.M.

 

 

 

 

August

Partial repair of the facade of the house - the restoration of decorative elements and partial repair of architectural monuments
55 Increasing the design capacity of the power supply:

– project preparation;

– the works

– installation of heating of a funnel of a gutter

70,0 th. UAH. Ґava VO. July For the operation of the building
56 Replacement machines, switches, overhaul of electric power 26,0 th. UAH. Ґava VO. July For the operation of the building
57 Reconstruction of the heating system According PKD AV Kudybin.

Korolchuk NA.

July August For the operation of the building
58 Heated gutters and drains 100 th. UAH. AV Kudybin. July August For the operation of the building
 

59

Re-equipment of the attic under the attic (reconstruction):

– production of energy passport;

– examination of the project;

– obtaining a construction permit (architectural monument);

– construction works (restoration);

– obtaining a certificate of commissioning;

– production of technical passport

5,0 th. UAH

55,0 th. UAH

 

AV Kudybin.

Andrew VD.

 

October

 

For the purpose of rational use of property

7,0 th. UAH.

a house on the street. Shashkevych, 6 in Ivano-Frankivsk

 
60 Preparation of design documentation and replacement of electrical equipment and wiring (if necessary) 30,0 th. UAH.  

V.Gava

 

3-quarter

The absence of central or individual heating
61 Installation of electric heating system (if necessary)

 

80,0 th. UAH. V.Gava, A.Kudybin  

4-quarter

1 2 3 4 5 6

a house in the street Sheptytsky, 3 the mind. Ivano-Frankivsk

 

62

Partial roof covering repair 100,0 th. UAH.  

Tymchiy AM.

 

May

Eliminate leaking into the room 4th floor
 

63

Repair of electrical networks, installing electric meter 10,0 th. UAH.  

Ґava VO.

 

March

Replacing old equipment and repair networks
 

64

Production estimates for modernization of boiler house roof, installation of additional equipment required 25,0 th. UAH. Tymchiy AM. April To start the boiler operation and space heating
65 Commissioning of the boiler house roof 50 th. UAH. Tymchiy AM. September
a house on the street. Yunosti, 3 in Ivano-Frankivsk
66 Cleaning the fire pond 50 th. UAH. Podgorny AV. April According to the "Rules of fire safety in Ukraine"
67 Equipping an emergency exit from the territory 25 th. UAH. Podgorny AV. May
General works
68 Maintenance of engineering networks (plumbing, electrical equipment, water supply and drainage system) AV Kudybin. during the year
69 Providing services in health facilities, owned by the utility company, Ivano-Frankivsk Regional Council operating assets and compliance access control  

Podgorny AV.

 

during the year

Fulfillment of the CE operating assets
70 Fire-retardant treatment of wooden structures (roofs, scenes, etc.) on objects:

– St.. Independence, 46

– 25 Sichovykh Striltsiv Street

– St.. Shashkevych 2

50,0 thousand.

15,0 thousand.

15,0 thousand.

 

 

Tymchiy AM.

 

 

during the year

 

According to the "Rules of fire safety in Ukraine"

71 Making plans for evacuation

– St.. Hrushevskoho 21

– Mickiewicz Square, 4

– St.. Vasyliianok, 62a

– St.. Shashkevych 2

– St.. Independence 46

– Starozamkova Street, 2

– Halytska Street, 45

– 25 Sichovykh Striltsiv Street

– Nezalezhnosti Street, 5

– Sheptytskoho Street, 3

12,0 thousand.

3,0 thousand.

6,0 thousand.

5,0 thousand.

12,0 thousand.

3,0 thousand.

5,0 thousand.

6,0 thousand.

5,0 thousand.

5,0 thousand.

 

 

Tymchiy AM.

 

 

during the year

 

According to the "Rules of fire safety in Ukraine"

72 Replacement, tending rinv, drainage pipes at facilities (45 Halytska Street), St.. Sichovykh Striltsiv, 25, St.. Shashkevych 2,) 60 thousand. Ukraine Ya.M. May June Preservation of monuments of local importance

 

1 2 3 4 5 6
73 73.1.Maintenance of fire extinguishers at the sites

73.2.Maintenance of fire water supply at the facilities

40,0 thousand.

110,0 thousand.

 

Tymchiy AM.

 

under the terms

Providing adminbudivel fires
74 Permits from the "Carpathian ETC" in the operation of boilers 50,0 thousand. Tymchiy AM. the heating period Fulfillment of the CE operating assets
75 Carrying out maintenance of elekronnoho vote "Chamber" 40 thousand. Budzyk.V.M. during the year
76 Maintenance alert system, PBX telephone system Krutsyk LB. during the year
77 Maintaining sanitary condition of rooms and his office Haiduk SS. during the year
78 Cleaning house areas and keeping them in good condition Haiduk SS. during the year
79 Support in meeting rooms during meetings, sessions and other events. 20 thousand. Budzyk.V.M. during the year
80 Conducting periodic training in the workplace, enterprise software areas kits, personal protective equipment), training laws and regulations, Law of Ukraine "On Labor Protection" 50 thousand. Tymchiy AM. during the year To prevent injury and pounding CE operating assets
81 Control energy costs 25 thousand. Ґava VO. during the year To implement measures to save money and resources
82 Accounting, financial reporting Pasichnyk VV. during the year According to current legislation
83 Maintenance personnel and administrative documents Romanov NV. during the year According to current legislation
84 procurement Planning, Approval of the annual procurement plan, preparation of tender documentation, Disclosure of procurement and report on public procurement Jurkiewicz VM. during the year According to current legislation
85 Purchase of work clothes for employees 50,0 th. UAH. Tymchiy AM. March For performance

 

 

Babelskyy C. AV Kudybin.

In Jurkiewicz. Korolchuk NA.

In Pasichnyk. Podgorny AV.