APPROVED
Director of the municipal enterprise
Ivano-Frankivsk Regional Council
Operating assets
Kostyshyn VI.
«___» __________ 2018r.
work plan
utility company, Ivano-Frankivsk Regional Council operating assets
on 2019 year
Number s / n | The content of the event | The estimated cost of
(thousand. UAH. ) |
Responsibility | Term
implementation |
Note (justification of works) | ||||||||
1 | 2 | 3 | 4 | 5 | 6 | ||||||||
1 | Post offers key spending on the regional budget allocations for budget 2019 year | According to budget allocations | V.Kostishin
V.Pasichnyk |
In order to meet the regional target program of support of the utility company, Ivano-Frankivsk Regional Council operating assets | |||||||||
in the administrative building on the street. Hrushevskoho, 21 in Ivano-Frankivsk | |||||||||||||
2 | Replacement of roofing Corps of Engineers - about 500 m. (PVC membrane coating):
– cost estimates for work, examination of project documentation for roof repairs; – roof covering repair of buildings and engineering corps |
250,0 th. UAH. |
AV Kudybin.
Dorosh I.R. |
June | In order to safeguard flowing rain water and tadyh uprymischennya engineering unit, Switchboard.
Certificate examination 03.10.2016r. |
||||||||
3 | Estimation of replacement of windows for metal-plastic constructions and carrying out their replacement:
3.1. corridors – 9 PC. 3.2. Second floor lobby -7 pieces (large) 3.3. 1-and security post - 2 PC. (large) 3.4. windows on 6 fl. – 7 PC. (offices № 650-655) |
|
Korolchuk NA. | July | To ensure heat saving resources and budget | ||||||||
80,0 th. UAH. | |||||||||||||
80,0 th. UAH. | |||||||||||||
25 th. UAH. | |||||||||||||
70,0 th. UAH. | |||||||||||||
1 | 2 | 3 | 4 | 5 | 6 | ||||||||
4 | Installation of an external video surveillance system:
– development of the scheme of installation of video surveillance system; – development of estimates for the execution of works; – acquisition and installation of a video surveillance system and its renewal in operation. |
158,0 th. UAH. | Ґava VO.
VM Budzyk. |
May | To control access to the commercial court, entry through the 3rd post, maintenance of a spare entrance from UKB | ||||||||
5 | Installation of fire alarm system:
– installation of a fire alarm system |
1000,0 th. UAH. |
Tymchiy AM. |
by August | According to the "Rules of fire safety in Ukraine" | ||||||||
6 | Replacement of pumps for water supply for fire systems. | 100,0 th. UAH. | Tymchiy AM. | by September | Replacing old pumps for the operation of the fire water supply system. | ||||||||
7 | Substitutions and repair valves Fire system | 15,0 th. UAH. | Tymchiy AM. | by September | |||||||||
8 | Manage lighting in a house facade, replacement corridor for LED fluorescent lamps- lighting | 180,0 th. UAH. | Ґava VO. | to December | For energy savings and budget. | ||||||||
9 | Replacing the pump wells | 50, 0 th. UAH. | AV Kudybin. | the first quarter | Replacing old pumps for water supply. | ||||||||
10 | Replacement warning system | 50,0 thousand. | VM Budzyk.
Tymchiy AM. |
by September | Installation of warning in case of emergency | ||||||||
11 | Testing ground contour elevators | 12,0 th. UAH. | Ґava VO. | June July | 1 once a year as required PBEES | ||||||||
12 | Purchase of PPE, ZEZ, portable ground | 15,0 th. UAH. | Tymchiy AM. | by August | According PBEES, according to safety requirements | ||||||||
13 | Concluding agreements with licensed organizations:
13.1. maintenance of elevators 13.2. The metrological calibration of pressure gauges, thermometers, etc.. 13.3. for examination of pressure vessels (roof boiler room, pump receivers) 13.4. maintenance of boilers |
101,0 th. UAH. |
Ґava VO. |
January |
To keep in good condition technically equipment and machinery |
||||||||
30,0 th. UAH. | Tymchiy AM. | February | |||||||||||
15,0 th. UAH. | Tymchiy AM. | January | |||||||||||
115,0 th. UAH. | Dorosh IV. | January | |||||||||||
14 | Replacement voice in the courtroom on the fourth floor | 180 th. UAH. | VM Budzyk. | April | To streamline and modernize the sound system in the hall | ||||||||
15 | 15.1.The current repair work on the premises. | 400,0 th. UAH. | Korolchuk NA. | the need | To maintain an office building in good condition | ||||||||
15.2.Carrying out routine maintenance in the corridor, hall on 7 floor of OTB "Galychyna" (design project, estimate, tender procedure, carrying out works). | 200,0 thousand. | Basarab VM.
Ґava VO. Korolchuk NA. |
1-second quarter | ||||||||||
16 | Reconstruction of the sound system in the hall 500 places on 1 fl. | 160,0 th. UAH. | VM Budzyk. | June | To streamline and modernize the sound system in the hall | ||||||||
17 | Replacing Trident on the house | 65.00 th. UAH. | Babelskyy S.D | June | Production of the new | ||||||||
1 | 2 | 3 | 4 | 5 | 6 | ||||||||
18 | Repair rainwater pipes on the building of the vul.Shpytalnoyi | 5 th. UAH. | AV Kudybin.
Korolchuk NA. |
January February | Rozhermetezatsiya drainage system | ||||||||
19 | Examination of 3 lifts and Technical Overview 2 lifts | 20 th. UAH. | Ґava VO. | June | Maintenance of elevators in working order | ||||||||
20 | Replacement of two elevators (№6 and №8) | 2mln.200tys.hrn. | Ґava VO. | 4-quarter | Due to the end of life | ||||||||
a house on the street. Vasyliianok, 62in m. Ivano-Frankivsk | |||||||||||||
21 | Restoration of the building fire suppression systems | 150,0 th. UAH. | Tymchiy AM. | October | According to the rules of fire safety | ||||||||
22 | Repair of drainage systems and parts of the house facade | 50,0 th. UAH. |
Ukraine Ya.M. |
May |
Securing water from falling on the facade and its destruction | ||||||||
23 | Current repairs of the stairwell and facade of the 1st floor | 65,5 th. UAH. | Korolchuk NA. | June | Without repair with 1975 p | ||||||||
24 |
Replacement power panels and machines | 25,0 th. UAH. | Ґava VO. | April | Due to the end of life | ||||||||
25 | Replacing incandescent bulbs to LED – lighting | 8,0 th. UAH. | Ґava VO. | March | To save electricity | ||||||||
26 | Setting the ramp for people with disabilities in accordance with the norms and standards | 50,0 th. UAH. | Ya.Bugayçuk
|
April | For the needs of people with disabilities | ||||||||
a house on the street. Harkusha, 9 in the city of Ivano-Frankivsk (early XX century) | |||||||||||||
27 | Completion of repairs back of the house
|
150,0 th. UAH. | Dorosh IV.
|
March | Restoration of the facade architectural monuments | ||||||||
a house on the street. Galician, 45 the mind. Ivano-Frankivsk (early twentieth century) | |||||||||||||
28 |
Repair roof covering, carrying out repair and reconstruction works of balconies and decorative elements of the facade (project, expert report, permission)
– drafting, project examination; – obtaining a permit; – conducting a tender procedure for the performance of works; – the works |
2800,0 th. UAH. |
AV Kudybin.
Andrew VD. |
May |
With a view to keeping the architectural monument of local importance in good condition and reconstruction emergency facade.
Report №33 / 16 on the technical inspection of building structures 29.10.15. |
||||||||
in a house on Mickiewicz Square, 4 in Ivano-Frankivsk |
|||||||||||||
1 | 2 | 3 | 4 | 5 | 6 | ||||||||
29 | Re-heat supply, Heat meter installation | 50 th. UAH. | Dorosh I.R.
Tymchiy AM. |
May | For easy and timely access to communications | ||||||||
30 | 30.1.Reconstruction of the assembly hall:
– drafting, – examination of the project, obtaining a permit; – conducting a tender procedure for the performance of works; – the works
30.2.Repair of the rack for security guards in the lobby of the 1st floor |
700 th. UAH |
Basarab VM. Dorosh I.R. Korolchuk NA. Andrew VD.
|
June
January |
Not long held Repair |
||||||||
in the administrative building on the street. Independence, 46 in Ivano-Frankivsk | |||||||||||||
31 | Replacement for heating 1 fl. foyer | 100 th. UAH | Dorosh I.R. | until September | In order to prevent heat loss of resources | ||||||||
32 | Repair (replacement) of pipes, (risers) heating system in the house | 250 th. UAH | Dorosh I.R. | until September | |||||||||
33 | Repair of the roof over the music school and sound system | 50 th. UAH. | Dorosh I.R. | May | To eliminate leaks | ||||||||
34 | 34.1.Purchase of a 3-phase generator to connect the boiler room during an emergency power outage
34.2.Acquisition of the cart of hydraulic SVU-C20T 1150 mm for carrying out unloading of pellets |
60,0 th. UAH.
7,0 th. UAH. |
Andrew VD. |
February | For bezpereboynoy of boiler | ||||||||
35 | Construction of a canopy (warehouse) near the boiler room for pellets | 50 th. UAH | Dorosh I.R.
Lahottskyy IM. |
June | To save pellets | ||||||||
36 | Enclosures territory, Parking arrangement, installation of paving (purchase of materials, performance of works) |
350,0 th. UAH. |
Lahotskyy IM. |
May | For oblahodzhennya and landscaping the surrounding areas | ||||||||
37 | Installation of fire alarm:
37.1. production of construction documents 37.2. installation of fire alarm in the music school (2-5 floor) 37.3. installation of fire alarm in the hall, foyer |
214, 0 thousand. |
Tymchiy AM.
|
June
|
According to the "Rules of fire safety in Ukraine" |
||||||||
295,0 thousand. |
|||||||||||||
38 | Conducting mass cultural and entertainment events | Lahotskyy IM. | during the year | In order to profit from the rental of premises | |||||||||
a house on the street. Independence, 5 in the city of Ivano-Frankivsk (1870) | |||||||||||||
39 |
Installation of electrical networks on the 2nd and 3rd floors (yard extension) | 200,0 th. UAH. |
Ґava VO. |
May |
Report №33 / 15 on the technical inspection of building structures 28.09.15. | ||||||||
1 | 2 | 3 | 4 | 5 | 6 | ||||||||
40 | Facade repair (partial) | 271,8 th. UAH. | Andrew VD. | June | To maintain an office building in good condition | ||||||||
41 | Repair staircase, Interior corridors and yard extension 2-3 floors | 100 th. UAH. |
Andrew VD. |
July |
To maintain an office building in good condition | ||||||||
42 | Re-equipment of the attic under the attic (reconstruction):
– production of energy passport; – making a project, examination; – obtaining a construction permit (architectural monument); – construction works (restoration); – obtaining a certificate of commissioning; – production of technical passport |
AV Kudybin. Andrew VD. |
October |
For the purpose of rational use of property |
|||||||||
5,0 th. UAH. | |||||||||||||
55,0 th. UAH. | |||||||||||||
7,0 th. UAH. | |||||||||||||
43 |
Manufacturing specifications on electrical facilities of the 2nd and 3rd floors | 46,0 th. UAH. |
Ґava VO. |
June |
To ensure the supply of electricity to the object | ||||||||
44 | Replacement power supply building | 200,0 th. UAH. | Ґava VO. | during the year | Located in poor condition | ||||||||
45 | Repair of the roof drainage system | 40,0 th. UAH. | Andrew VD. | August | damaged by rust, flows | ||||||||
46 | Repair of the 2nd and 3rd floors (courtyard extension) for rent | 260,0 th. UAH. | Andrew VD. | September | Is in disrepair | ||||||||
47 | Replacement of windows and repair of doors (facade 2,3 pov.-16 pc. window, 2pcs of balcony doors) | 40,0 th. UAH. | Andrew VD. | during the year | Is in disrepair | ||||||||
in a building on Market Square, 8 in the city of Ivano-Frankivsk (1870) | |||||||||||||
48 | Partial repair of house facade
|
50,0 th. UAH. |
Tymchiy AM.
|
June |
To restore the facade architectural monuments | ||||||||
a house on the street. Sichovykh Striltsiv, 25 in Ivano-Frankivsk (1906) | |||||||||||||
49 | Preparation of land documentation; | Babelskyy S.D | 3-neighborhood | In the absence of sewerage system in the basement | |||||||||
50 | Reconstruction of the internal sewerage of the basement:
– project examination; – concluding an agreement with the contractors; – obtaining a construction permit; – works
|
325,0 th. UAH |
AV Kudybin. |
July |
|||||||||
1 | 2 | 3 | 4 | 5 | 6 | ||||||||
51 | Replacing the house risers internal sewage system | 50,0 thousand. | AV Kudybin. | June | Is in disrepair | ||||||||
52 | Replacement of GRP (input switchgear) and SHCHO (accounting board) of the building | 15,0 thousand. | Ґava VO. | July | In connection with faults | ||||||||
53 | Production of construction project of the gas boiler | 120,0 thousand. | Kudibn AV.
Tymchiy AM. |
December | In order to save energy and money budget | ||||||||
a house on the street. Shashkevych, 2 in Ivano-Frankivsk (early twentieth century) |
|||||||||||||
54 |
Partial repair of the facade - Update decorative elements of the building | 190,0 th. UAH. |
Ukraine Ya.M.
|
August |
Partial repair of the facade of the house - the restoration of decorative elements and partial repair of architectural monuments | ||||||||
55 | Increasing the design capacity of the power supply:
– project preparation; – the works – installation of heating of a funnel of a gutter |
70,0 th. UAH. | Ґava VO. | July | For the operation of the building | ||||||||
56 | Replacement machines, switches, overhaul of electric power | 26,0 th. UAH. | Ґava VO. | July | For the operation of the building | ||||||||
57 | Reconstruction of the heating system | According PKD | AV Kudybin.
Korolchuk NA. |
July August | For the operation of the building | ||||||||
58 | Heated gutters and drains | 100 th. UAH. | AV Kudybin. | July August | For the operation of the building | ||||||||
59 |
Re-equipment of the attic under the attic (reconstruction):
– production of energy passport; – examination of the project; – obtaining a construction permit (architectural monument); – construction works (restoration); – obtaining a certificate of commissioning; – production of technical passport |
5,0 th. UAH 55,0 th. UAH
|
AV Kudybin. Andrew VD. |
October |
For the purpose of rational use of property |
||||||||
7,0 th. UAH. | |||||||||||||
a house on the street. Shashkevych, 6 in Ivano-Frankivsk |
|||||||||||||
60 | Preparation of design documentation and replacement of electrical equipment and wiring (if necessary) | 30,0 th. UAH. |
V.Gava |
3-quarter |
The absence of central or individual heating | ||||||||
61 | Installation of electric heating system (if necessary)
|
80,0 th. UAH. | V.Gava, A.Kudybin |
4-quarter |
|||||||||
1 | 2 | 3 | 4 | 5 | 6 | ||||||||
a house in the street Sheptytsky, 3 the mind. Ivano-Frankivsk |
|||||||||||||
62 |
Partial roof covering repair | 100,0 th. UAH. |
Tymchiy AM. |
May |
Eliminate leaking into the room 4th floor | ||||||||
63 |
Repair of electrical networks, installing electric meter | 10,0 th. UAH. |
Ґava VO. |
March |
Replacing old equipment and repair networks | ||||||||
64 |
Production estimates for modernization of boiler house roof, installation of additional equipment required | 25,0 th. UAH. | Tymchiy AM. | April | To start the boiler operation and space heating | ||||||||
65 | Commissioning of the boiler house roof | 50 th. UAH. | Tymchiy AM. | September | |||||||||
a house on the street. Yunosti, 3 in Ivano-Frankivsk | |||||||||||||
66 | Cleaning the fire pond | 50 th. UAH. | Podgorny AV. | April | According to the "Rules of fire safety in Ukraine" | ||||||||
67 | Equipping an emergency exit from the territory | 25 th. UAH. | Podgorny AV. | May | |||||||||
General works | |||||||||||||
68 | Maintenance of engineering networks (plumbing, electrical equipment, water supply and drainage system) | AV Kudybin. | during the year | ||||||||||
69 | Providing services in health facilities, owned by the utility company, Ivano-Frankivsk Regional Council operating assets and compliance access control |
Podgorny AV. |
during the year |
Fulfillment of the CE operating assets | |||||||||
70 | Fire-retardant treatment of wooden structures (roofs, scenes, etc.) on objects:
– St.. Independence, 46 – 25 Sichovykh Striltsiv Street – St.. Shashkevych 2 |
50,0 thousand. 15,0 thousand. 15,0 thousand. |
Tymchiy AM. |
during the year |
According to the "Rules of fire safety in Ukraine" |
||||||||
71 | Making plans for evacuation
– St.. Hrushevskoho 21 – Mickiewicz Square, 4 – St.. Vasyliianok, 62a – St.. Shashkevych 2 – St.. Independence 46 – Starozamkova Street, 2 – Halytska Street, 45 – 25 Sichovykh Striltsiv Street – Nezalezhnosti Street, 5 – Sheptytskoho Street, 3 |
12,0 thousand. 3,0 thousand. 6,0 thousand. 5,0 thousand. 12,0 thousand. 3,0 thousand. 5,0 thousand. 6,0 thousand. 5,0 thousand. 5,0 thousand. |
Tymchiy AM. |
during the year |
According to the "Rules of fire safety in Ukraine" |
||||||||
72 | Replacement, tending rinv, drainage pipes at facilities (45 Halytska Street), St.. Sichovykh Striltsiv, 25, St.. Shashkevych 2,) | 60 thousand. | Ukraine Ya.M. | May June | Preservation of monuments of local importance
|
||||||||
1 | 2 | 3 | 4 | 5 | 6 | ||||||||
73 | 73.1.Maintenance of fire extinguishers at the sites
73.2.Maintenance of fire water supply at the facilities |
40,0 thousand.
110,0 thousand. |
Tymchiy AM. |
under the terms |
Providing adminbudivel fires | ||||||||
74 | Permits from the "Carpathian ETC" in the operation of boilers | 50,0 thousand. | Tymchiy AM. | the heating period | Fulfillment of the CE operating assets | ||||||||
75 | Carrying out maintenance of elekronnoho vote "Chamber" | 40 thousand. | Budzyk.V.M. | during the year | |||||||||
76 | Maintenance alert system, PBX telephone system | Krutsyk LB. | during the year | ||||||||||
77 | Maintaining sanitary condition of rooms and his office | Haiduk SS. | during the year | ||||||||||
78 | Cleaning house areas and keeping them in good condition | Haiduk SS. | during the year | ||||||||||
79 | Support in meeting rooms during meetings, sessions and other events. | 20 thousand. | Budzyk.V.M. | during the year | |||||||||
80 | Conducting periodic training in the workplace, enterprise software areas kits, personal protective equipment), training laws and regulations, Law of Ukraine "On Labor Protection" | 50 thousand. | Tymchiy AM. | during the year | To prevent injury and pounding CE operating assets | ||||||||
81 | Control energy costs | 25 thousand. | Ґava VO. | during the year | To implement measures to save money and resources | ||||||||
82 | Accounting, financial reporting | Pasichnyk VV. | during the year | According to current legislation | |||||||||
83 | Maintenance personnel and administrative documents | Romanov NV. | during the year | According to current legislation | |||||||||
84 | procurement Planning, Approval of the annual procurement plan, preparation of tender documentation, Disclosure of procurement and report on public procurement | Jurkiewicz VM. | during the year | According to current legislation | |||||||||
85 | Purchase of work clothes for employees | 50,0 th. UAH. | Tymchiy AM. | March | For performance | ||||||||
Babelskyy C. AV Kudybin.
In Jurkiewicz. Korolchuk NA.
In Pasichnyk. Podgorny AV.